Home > technical > Big, No, And Just Enough

Big, No, And Just Enough


Assume (which is a bad thing to do) that you can characterize a project by three activities: Planning, Designing, and Building. Next, assume (which is still a bad thing to do) that the planning and designing activities can each be sub-characterized by “Big“, “No“, and “Just Enough“.

UF Combos

Forgetting about what “Just Enough” exactly means, check out this methodology-agnostic probability density function:

UF Prob

Do you think the curve is right? You better not. The sample size BD00 used to generate it is zero,

  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: